Basic Information
- Demolition and silting phase of trench 3
Contexts
Narrative
-
- Demolition and abandonment phase of trench 3 after the disuse of structure F305 and F306. Demolition deposits seal in-situ masonry and silting-up deposit (3035) can be seen over structures. Post-med pottery has been retrieved from the silt deposits suggesting that these structures were abandoned and disused over a long period of time.
-
- Raksha Dave
- 17-10-2016
Dating Narrative
- No Interpretations