Plan | Short Description | Context | Drawn By | Drawn On | Options |
---|---|---|---|---|---|
LA_1 | Posthole with packing material | Chris Brown | 16-7-2014 | ||
LA_2 | Overall trench plan Drawn at 1:20 Comprises of 3 sheets | James Earley | 16-7-2014 | ||
LA_3 | Multi-context plan of trench 10. Comprises of 3 sheets and drawn at 1:20 | Raksha Dave | 20-7-2014 | ||
LA_4 | Multi-context post-ex plan of trench 9 drawn at 1:20 | Matthew Juddery | 22-7-2014 | ||
LA_5 | Pre-ex plan of trench 8 drawn at 1:20 | Matthew Juddery | 22-7-2014 | ||
LA_6 | Post-ex plan of trench 8 drawn at 1:20 | Matthew Juddery | 22-7-2014 | ||
LA_7 | Post-Ex plan of trench 12 drawn at 1:20 | Ben Swain | 22-7-2014 | ||
LA_8 | post ex plan of trench 1 drawn at 1:50 | Ben Swain | 22-7-2014 | ||
LA_9 | post ex plan of trench 13 drawn at 1:20 3 sheets in total | Ben Swain | 23-7-2014 | ||
LA_10 | Pre Ex plan of trench 3 drawn at 1:50 | Rita Baker | 28-4-2015 | ||
LA_11 | Pre-ex plan trench 22 | Ben Swain | 17-7-2015 | ||
LA_12 | Pre-ex plan trench 21 | Ben Swain | 17-7-2015 | ||
LA_13 | Pre-ex plan trench 20 | Ben Swain | 17-7-2015 | ||
LA_14 | Mid-ex Trench 19 | Ben Bazeley | 16-7-2015 | ||
LA_15 | Trench 16 Mid-ex | Jules Hynam | 16-7-2015 | ||
LA_16 | Pre ex plan trench 18 scale 1:50 | Andrew Date | 19-7-2015 | ||
LA _17 | Plan of (22003) | Nigel Steel | 22-7-2015 | ||
LA_18 | Pre excavation plan of (22004) and (22006) in Trench 22 | Nigel Steel | 22-7-2015 | ||
LA_19 | Post excavation plan of Trench 22 | Nigel Steel | 22-7-2015 | ||
LA_20 | Rubble deposit above wall | Rosanna Ring | 23-7-2015 | ||
LA_21 | Post ex plan of trench 18 drawn at 1:20 | Ben Swain | 23-7-2015 | ||
LA_22 | Pre ex plan trench 17 drawn at 1:20 | Chris Brown | 24-7-2015 | ||
LA_23 | Multi-context plan of floor surface (14006) and masonry [14008] | Raksha Dave | 26-7-2015 | ||
LA_24 | Post excavation plan of trench 14 | Raksha Dave | 26-7-2015 | ||
LA_25 | Mid ex plan trench 17 | Rita Baker | 27-7-2015 |