Basic Information
- Post hole in the eastern end of the building area seen once the silting layer had been removed, cutting ring ditch F924
Contexts
Narrative
-
- Post hole in the eastern end of the building area seen once the silting layer had been removed, cutting ring ditch F924. It was 0.50m in diameter and 0.13m deep.
-
- Nat Jackson
- 24-2-2021
Dating Narrative
- No Interpretations
Matrix
-
- [not set]
- [not set]