Basic Information
- E-W linear
Contexts
Narrative
-
- An east to west running ditch in the 'car park' trench area of trench 2. It ran from the western baulk for 11.55m before petering out in the middle of the trench. It had a maximum width of 0.75m and a maximum depth of 0.09m. It cut the ring ditch F320 and post hole F324.
-
- Nat Jackson
- 25-2-2021
Dating Narrative
- No Interpretations
Matrix
-
- [not set]
- [not set]