Features at Earth Trust

Explore the open archaeological data from our digs at Earth Trust

Basic Information

  • Post hole in the building area seen once the silting layer had been removed

Contexts

  • Context: WIT_9102
    • Cut of a post hole underneath the silting layer in the building
    • Nat Jackson
    • 26-1-2021
  • Context: WIT_9103
    • Fill of a post hole [9102] underneath the silting layer in the building
    • Nat Jackson
    • 26-1-2021

Narrative

    • Post hole in the building area seen once the silting layer had been removed. It was 0.34m long, 0.30m wide and 0.06m deep.
      • Nat Jackson
    • 24-2-2021

Dating Narrative

  • No Interpretations

Matrix

CLOSE